Equipment on floor plans
Every floor mapped with its own layout and every item marked in its exact position with status-based colour coding: technicians know where to go, companies get full visibility.

HSE Suite · Exteryo Safety 4.0
Fire extinguishers, hydrants, hose reels, fire doors and emergency lights on every floor plan: inspection rounds via smartphone, five calculated deadlines per item, signed reports and an instantly accessible control log.


For every piece of equipment, the platform calculates surveillance, periodic inspection, overhaul, testing and end-of-life dates based on type, extinguishing agent, manufacturing date and cylinder date. The schedule lists upcoming tasks in order, and logging a completed check automatically shifts the next deadline forward.


Every check enters the building's control log complete with date, result, technician name and qualification level, ready to export as a printable PDF. Companies can also upload certificates from paper-based maintenance providers and log monthly internal surveillance: everything in one place.


A selection of users and partners working with Exteryo Safety 4.0, the core HSE suite platform.










The suite
One platform, ES4.0, available in two editions: ES4.0 for those carrying out inspections (inspectors, maintenance technicians, training organisations, suppliers) with licensed Lifting, Firefighting and Training modules; Worker Manager for companies, all-inclusive.